In the annual rainy season, I'm Suzhou Branch to undertake the ninth horticultural exposition of Jiangsu Province Road and pipeline section II project is in full swing. The project is a key project of the province, the time limit for a project is tight, but the continuous rainfall, the construction progress is seriously affected by the severe test.
Suzhou, the rainy season, the rain is basically about a week, causing serious impact on road construction. In this grim situation, the leadership of the company that, although the rain is a natural disaster, but we must try to catch up with the progress, so I decided to increase investment, for the ongoing road construction dust, is spread paved the dust in the rain before rolling, then all covered, until after the rain, lifting cover Fanshai. This greatly accelerated the progress.
In Jiangsu Province horticultural exposition of this project, the construction unit has 11, so in this environment. We want to want to come to the fore, quick step, and safety, quality can not be left behind. Since the start, the project department to implement the program management, establish and improve the construction organization, so that a clear division of responsibilities to the people. Do construction according to the appropriate standard strictly, and QC supervision and inspection, so consistent data and test and site construction, to ensure the progress of the project. To do the scene without a safety accident, and to set up a security officer on the scene and the office area to check and supervise. Do the construction drawings to understand thoroughly, as soon as possible to find the contradiction between the drawings and the scene, and put forward and combine the actual situation, formulate the most reasonable construction plan, in order to speed up the construction. To control material consumption, improve the utilization of materials and reduce the cost of the project. To achieve a healthy competition between the team.
In the summer, the Suzhou branch of the company to meet the time and honor of fighting, under the leadership of the leadership, our project department combined with the actual situation, the rainy season to prevent measures, so as to achieve the progress of the safety and quality control is not relaxed. Don't give up in the face of difficulties, in the details and more seriously, in front of the courage to assume responsibility. In front of the pressing time. We want to do Yuezhanyueyong, the spell more powerful, strive for in the construction of 11 units, Yong Chong first, fight us Changzhou Municipal loud corporate image. (Xue Zhen)
The storm first |