Changzhou financial business district municipal facilities engineering, one of the North Yongning (a new road to Hengtang Hexi Road) project site, the motor of excavators, bulldozers roar, the construction personnel shuttle does not cease. Under the command of the engineering and technical personnel, rain and sewage pipe line is installed in a section of a place, road roadbed in a m a m extends forward, road Weidang, mound dust-proof net door arranged neatly, send nervous, civilization, orderly construction scene...
Business area within the range of the municipal infrastructure construction mainly includes: Department of Heng Tang Road West, North Yongning, new hall north, new way, dragon road, Hengtang River Wetland Park, Central Park and other interval road. This year, the implementation of the municipal road works as "two vertical and two horizontal". Yongning Road (a new road to Wang Hexi Road) project is a major road in the.
Design of the road length of about 135 meters, 16-36 metres in width, on both sides of the sidewalk in abeyance, sewage pipes, rainwater pipeline length of 1200 meters, respectively, 1750 meters. Since September 1st began, the second branch of Yongning road project construction workers to work in the evening, the construction site. After more than 20 days of construction, the current total of laying rainwater and sewage pipelines of 1000 meters, 12 block masonry inspection wells, excavation road roadbed 500 meters. According to the construction progress, is expected to December 31st, according to the plan to complete the construction tasks of the project. (Zhou Yong) |