2016 April 18 to 5 March 18, the ninth Jiangsu Province Horticultural Exposition will in Wuzhong District town held, then there will be built with a feature of the Suzhou Garden Expo.
In the face of such a high-profile project, in the face of such a tight construction period, Suzhou branch from March this year to September, to overcome difficulties, the construction site soil poor, high groundwater level, in some areas have to carry out deep point precipitation, the water level dropped to the appropriate height of the rear can be construction operations, which to some extent to the construction quality control difficulties. Construction site environment is complex, and many construction units, resulting in the construction of the construction site is narrow, the management of continuous, large quantity, point, scattered and other issues. Bridge has three seat single span over the age of 18 meters, according to expert demonstration project construction of bridge, construction is very difficult, difficult, coupled with the June rainy, typhoon, the river water level does not always fall down, resulting in seriously lagging behind schedule. Finally in the continuous efforts of all the staff of project department and company leadership, we still before the provisions of the construction time node complete, the quality and quantity of the completed the park over to our task, all roads have been completed coarse asphalt paving, and 11 bridges has been in accordance with the requirements of Party A's completed, the pipeline project completed, provided security and convenience for the next garden and greening and other construction, as of April 2016 to a dream round Jiangnan made due contributions, and are subject to local government and higher levels of awards. (Tan Changhai text / photo) |