Under the leadership of the company under the care, in coordination with the construction side and the school, the branch company and the project department and the construction team cooperation fighting, Zhonglou District Experimental Middle School Sports Stadium project finally in October 20, 2015 smooth completion and acceptance, the overall appearance and function get construction and school recognized, processes and the division of engineering quality acceptance testing are qualified. Especially in the construction process of plastic runway, we strictly control the plastic material purchase, strictly control the construction quality, no toxic plastic runway problems about the. Give the tower a experimental middle school environment standard, the quality standard of sports venues.
The project is located in the east of the city of my boy Hedong Road, Metasequoia Road north of Zhonglou District Experimental Middle School campus. The total area of about 20000 square meters. Including the standard 400 meter breathable plastic runway, bidirectional standard jumping pit lane, two standard shot put throwing zone, javelin throwing area and natural turf football field and imported automatic buried spray irrigation facilities site ambient lighting system. 16 meters tall flagpole ShengQiTai facilities etc.. Second branch, the formation of the project department in March 2015 15 approach formal construction, due to the complex geological conditions in the site, old plant large article about 700 square meters and oiliness of 3000 square meters, no main tomb 13 and depth of 40-60cm a variety of miscellaneous fill life garbage, so after entering the cleaning up the site, silt soil Sinotrans and pond treatment miscellaneous spent one and a half months time, in the basis of the plastic runway construction due to meet this year long rainy season and once in 200 years of torrential rain, greatly affected the the time limit for a project.
The smooth completion of the project for our company in the future of sports facilities construction bidding for a good performance, but also accumulated valuable experience for our company in the future construction of similar projects and sports facilities.
(full of ginger / Wen Wei Wei / photo) |