Week rivers ecological environmental engineering (No. two) is located in the city of Taizhou medicine high tech Zone, the concrete construction including large earthwork, landscape stone revetment, road construction and laying of the granite scenic spots, the project started on November 8, 2015, and through an inspection in July 30, 2016.
In the construction process, corresponding to the engineering characteristics, the project manager will be the construction area "sub field to households" to each construction technical personnel, so that each construction task to the people. Every evening, after the completion of the day's work, we will invariably come to the conference room to communicate to solve the key problems encountered in the construction process. For example: in the field of earthwork excavation measurement on line, we in order to control the river bank and the beautiful landscape line is smooth, the project department technical staff through encryption method and arrangement for precise lofting drawing coordinate to solve the construction difficulties; in the flat side of granite stone construction process, in order to ensure the quality of construction, laid in the side flat stone, we use a rubber hammer, a smooth solid, smoother lines, vertical pouring concrete in the back immediately laid good side of flat stones, to be completed after the concrete curing soil compaction; construction of local landscape nodes can be said to be the whole week rivers ecological environment engineering dragon punchline, in this regard, the project department through scientific management, have done a lot of meticulous work in the construction technology and quality control of the construction of landscape nodes, so that each node has complete landscape construction Finish.
In the construction process, Zhou Shanhe engineering encounters cold winter and rainy season invasion, climate change each of the completed project quality is a major test, and the construction project Department of the region every time we are able to "zero loss" feedback to the owners. Not only that, in the city's leadership in the process of multiple site inspections, Zhou Shan Department of engineering due to the strong sense of safety, construction technology and praise......
Now, look at this piece of the new "city green lung", in this beautiful scenery and pleasant green landscape, Zhou Shanhe project department, every staff full of excitement., we as in the past to uphold the Changzhou municipal "two are not afraid, not afraid of tired of the spirit, and actively implement the policy of the construction of high quality and high level, to produce a satisfactory answer to the people of Taizhou. |