Rail transit line project Station Road rehabilitation project of Hohai University since entering the station since the completion of the North pit 6% lime soil backfill, 10% dust construction, construction of all kinds of rain sewage pipeline 370 meters and the first layer of water stable paving work. The station of Hohai University is located in the center of new North District, the construction site safe and civilized traffic pressure, and other related requirements higher, therefore, the project department has taken relevant measures to ensure safe and civilized construction site:
In the field of safety construction, the project department regularly carries out safety education and safety disclosure to the construction staff, and continuously improves the safety awareness of construction personnel and prevents safety accidents. Personnel who enter the construction site must wear safety helmet, not wearing were prohibited from entering the construction site; construction at night, all personnel must wear a reflective vest; in other construction Earthwork transportation vehicles, set up special project department in the import and export of command and scheduling, to guarantee the safety of production on the platform; during the construction, because the edge of the hole is more, project department actively do have the edge of the hole, the hole immediately surrounding the safety enclosure, warning lights and warning signs set up, so that the safety of construction.
In the construction of civilization, the project in the construction site entrance set the car washing platform, arrange to carry out supervision on the safety and construction of roads and clean inside and outside the field, once the scene and the entrance road is polluted, and timely arrangements for personnel, vehicles and equipment wash clean and civilized construction.
The project will strictly abide by the safety regulations in the following work, actively implement the safe and civilized construction, continuously push forward the construction progress, and strive to create a safe and high quality projects, contributing to the implementation of the Changzhou municipal "hundred years old dream. |