homepage  |  Favorites  |  Chinese  |   weixin
Current position -> News -> Access to information

Access to information

City leaders visit the Dragon Road West site for high temperature condolences
The publisher:czszjs    Release time:2017-09-27    Hit:19895

 In July 21st, Jiaoyangsihuo, sweltering. Afternoon, Gao Yun, Yu Zhiping, city leaders Jiang Ziping and Liang Yibo for a row, braved the heat to high temperature in Changzhou municipal construction site Dragon Road extension project, they arrived at the site on the sympathies of the on-site construction personnel, send them a towel, summer drinks and other anti summer activities, and told everyone in the hot season construction take care of themselves, do a good job of production safety.

City leaders of the concern are all inspired by the spirit of the instructions, we have said will conscientiously implement the municipal leadership, actively implement the work of production safety, in high temperature season under the scientific organization, elaborate construction, quality and quantity to promote the construction, ensure the construction project completed on schedule, promoting the city function, for the benefit of the majority of the people of Changzhou.
Dragon Road West Extension Project West East Road, Xinlin Road, ERON Road, a total length of 2326.45 meters, planning red line width of 40 meters, the width of the southern half of the implementation plan, the implementation of the width of 21.5 meters. The road with the simultaneous implementation of rain water pipes, water supply, power supply, communication, gas pipeline, in the new situation of River Phoenix Phoenix Bridge a forward position, in the planning of the river bridge a new forward position.
In the construction process, although the scorching sun, the scorching heat, but in the west west dragon project site is one of the busy scene face be in full swing, "sauna days" of the arrival of the project department to implement the "two measures to avoid high temperature, break the middle", appropriate adjustment of the summer high temperature operation system. To ensure the construction safety and construction progress in summer.
Dragon road project since the start, has maintained a good state of construction, actively promote the spirit of municipal, grasp quality, good safety. In the future work, we will make persistent efforts, scientific management, striving for quality, so that the owners satisfaction, so that the people at ease.
 
 

Print this page || Close the window

Jiangsu province Changzhou City Blue Ocean 158 North Road| Zip code:213017 | Telephone:0086-0519-85501558 | Fax:0086-0519-85501558 | E-mail:czsz@czszjt.com

Copyright © CHANGZHOU MUNICIPAL ADMINISTRATION CONSTRUCTION ENGINEERING CO.,LTD.  蘇ICP備12078434號-1   Technical support:Public science and technology