The workers are still busy on the construction site in summer heat. In July 12th this year to enter the hottest days of the year, announced the coming of summer, the high temperature is maintained at 36-38 DEG C. The sun is relentless, the earth will be hot sun, I go out not long, is sweating, is in such a climate environment, the project department staff still stick to their respective positions, complete with strict in demands of his own work.
In the face of summer heat, project flow, and high temperature heat to dry, scientific and reasonable arrangements for staff time, labor intensity and working rhythm. For site workers, high temperature brings the most direct safety hazard is heat stroke. In order to avoid heat stroke, the project department has taken the following measures: (1) reasonable arrangements for work and rest time, take two, and job rotation to break the middle ", to avoid fatigue working under high temperature, thereby preventing employee heatstroke. (2) the temperature at 38 degrees Celsius when stop operation, and actively concerned with outdoor staff, provide adequate food and beverage, issuance of cool oil, essential balm, Dan and other Fangshujiangwen products. (3) the erection of the tea pavilion, arrange the site to stay cool enough for drinking tea, equipped with construction workers (Figure). (4) strengthening the publicity and education of outdoor staff sunstroke knowledge, nip in the bud.
In terms of safety in production, the project department insists on the responsibility to the people, and set up a safety inspection team, regularly carry out safety inspection of the construction site, focus on examination of electricity construction, scaffolding, sanitary and summer "five protection" (protection, electricity, cooling, anti poisoning, fire) implementation etc. the measures, do check erroneous ideas at the outset.
"The weather is hot and the people are doing great", and many people still remember the resounding slogan. In today's view, the slogan more emphasis should be a kind of spirit, a kind of state, rather than blindly fling caution to the winds. Therefore, only do not do with the high temperature and hot weather, scientific and reasonable arrangements for the staff's work schedule, labor intensity and work rhythm, in order to achieve employee occupational health and ensure construction time limit of two. |