homepage  |  Favorites  |  Chinese  |   weixin
Current position -> News -> Access to information

Access to information

High temperature, hot, muddy, not afraid of conservation, construction is not relaxed
The publisher:czszjs    Release time:2017-09-27    Hit:12169

 This year the rainy season rainfall is less than in previous years, the July and August heat has finally come, sustained high temperatures not only make people feel uncomfortable, a lot of asphalt pavement also began to appear all kinds of "high temperature disease": hold the bag, rutting, cement plate fracture and so on, these diseases not only affect the road traffic safety, but also put forward more high requirements for maintenance work.

Our maintenance construction personnel is not afraid of the summer heat, keep on fighting in the first line, road patrol, management, maintenance pit upheaval...... Where there is need, you can see their busy figure. After entering the high temperature season, BRT lanes and platform surrounding the road rutting is more serious, traffic driving has brought great security risks. Discovery of these circumstances, the maintenance branch held an emergency meeting to discuss countermeasures, decided to carry out road repair processing of semi flexible pavement technology by using the anti rutting evening traffic free time on BRT1 lane lines and 2 line station and the surrounding road, a total of approximately 4800 meters. The repaired Lane improves the skid resistance, wear resistance, rutting resistance and road carrying capacity of the road, and greatly prolongs the service life of the road.
Because of the particularity of construction maintenance (maintenance of sporadic, some construction sites in the downtown area), in hot weather, we can not completely avoid the construction time of high temperature, but also to avoid the rush hour traffic during construction. In the process of construction and maintenance, the workers in the hot environment of perspiration comes down like raindrops, stick to their jobs, and strive to do their work, actively carry out logistical work for the project department, on-site construction personnel equipped with enough Fangshujiangwen products, and strive to the quality and quantity to complete the construction tasks, and make positive contributions to the protection of public transport in Changzhou travel.
 
 

Print this page || Close the window

Jiangsu province Changzhou City Blue Ocean 158 North Road| Zip code:213017 | Telephone:0086-0519-85501558 | Fax:0086-0519-85501558 | E-mail:czsz@czszjt.com

Copyright © CHANGZHOU MUNICIPAL ADMINISTRATION CONSTRUCTION ENGINEERING CO.,LTD.  蘇ICP備12078434號-1   Technical support:Public science and technology