The project is located in Wuzhong District, Suzhou. The construction of the project is mainly to improve the local conditions of traffic facilities. Through the laying of synchronous road pipelines and the improvement of the road and bridge system, the local infrastructure and public service level are greatly improved.
The West Jin Feng Road, East Mountain Road, the road is about 2405.6m. The price is 68780027.74 yuan, the contract period of 535 calendar days, quality standard. The main contents include the construction of asphalt roads, drainage pipeline, bridge engineering, marking signs, greening, cable channel, monitor and signal lamp. This project is a key project in our company, Suzhou branch will improve the construction quality from the following three aspects:
In terms of quality control, we do well the quality control of raw materials, start from the source, check all the materials before they enter the field, do not enter the field for the inspection of the unqualified materials, strictly control the quality of the raw materials, control the quality of the construction, do the work of the technical submission of various working order, and set the quality control. To make points, clear the difficult and difficult measures, use the scientific quality control method, implement the effective control of the quality of the project, strengthen the management of the handover work, and implement the hanging board construction.
In the field of safety management, we insist on the policy of "safety first, prevention and comprehensive management", and we should attach great importance to all construction teams in the first place, and make sure to implement all kinds of preventive measures.
In the progress management, we take the principle of "work tight before tight" as the principle, grasp the progress, ensure the completion of the schedule, organize the time period scientifically and rationally, make the whole project close together in time and space, form a good lap between the work and process, so as to ensure the effective implementation of the schedule.
Under the leadership of the branch manager, we will work together to overcome the difficulties, carry forward the hard struggle spirit of the municipal Iron Army, strive for the successful completion of the construction tasks at an early date, and effectively build the project into high quality projects, and make the government "satisfied with the owners and let the government be relieved" by practical action. |