homepage  |  Favorites  |  Chinese  |   weixin
Current position -> News -> Access to information

Access to information

Discussion on the fine management of municipal maintenance
The publisher:czszjs    Release time:2018-06-19    Hit:12528

 In recent years, with the advancement of urbanization, urban transportation has developed more rapidly. The maintenance work of municipal facilities has created good conditions for the citizens to travel. It also provides a strong guarantee for large-scale activities such as the establishment and reinspection of civilized cities throughout the country. In order to continuously improve the quality of our maintenance, and actively build the municipal maintenance brand, we reflect the "fine" in the process of construction work, and do "fine" in the process of maintenance and management.

In the construction operation, for the asphalt road maintenance, the branch requires not only to dig out the base and asphalt in the damaged range and to clean the base, but also the line type must be straight after the foundation excavation, and the pit wall is not concave and convex. During the maintenance of the asphalt surface, the milling planer not only has to ensure that the bottom is flat and the edge is neat and vertical, but also needs to be milling a knife in the direction of the width to avoid the lateral wrong teeth and the border line is not smooth. After the asphalt rolling, it is necessary to check the seam by the special person and check the pavement smoothness with the three meter ruler, and add anti rutting agent to the middle and lower bitumen, and use the semi flexible anti rutting pavement to the stubborn disease of the BRT lane. For pavement joints, the surface of the 20 sides of the cracks must be cleaned before sewing. The surface must be smooth without protuberance and no bubbles. For piecemeal, side stone and other piecemeal repairs, we prepare and reserve the required varieties, specifications, sizes, and surface treatment methods one by one to ensure that the replacement material is consistent with the original pavement material, while improving the maintenance time; when dismantling, the surrounding panels are not damaged as far as possible; when the mortar or concrete is mixed, the protection is done well. To avoid two times of pollution to the facilities; when laying, the new and old materials are required to be smooth and smooth, and the blocks around the well or with the structures are used in the way of cutting together to ensure the smoothness and beauty. When the inspection well is replaced, it is necessary to ensure that the edge is not loose vertically after the base break, and the bent preburied reinforcement must be restored before the well frame installation, and the connection of the well frame and the shaft cover and the pavement is smooth.
In the management process of maintenance work, the branch subdivides the functions of personnel to make the posts and tasks put into practice, and in every level and link, each work is carried out efficiently and harmoniously. By improving the management process, the work quality and efficiency are improved. Meticulous management of municipal maintenance not only improves the quality of maintenance work, but also effectively improves the city appearance.
 
 

Print this page || Close the window

Jiangsu province Changzhou City Blue Ocean 158 North Road| Zip code:213017 | Telephone:0086-0519-85501558 | Fax:0086-0519-85501558 | E-mail:czsz@czszjt.com

Copyright © CHANGZHOU MUNICIPAL ADMINISTRATION CONSTRUCTION ENGINEERING CO.,LTD.  蘇ICP備12078434號-1   Technical support:Public science and technology