After the arrival of hot summer, most parts of the country were scorched by heatwaves. In the face of high temperature weather, the New Front Road project department adheres to people-oriented approach, ensuring the physical health and life safety of on-site staff. Based on the characteristics of the project, we have carefully studied and developed construction management measures during the high temperature season, and actively carried out construction management work during the high temperature season.
Before the start of the project, the project department organized a technical briefing meeting on construction safety during the high temperature season, watched summer construction safety education videos, popularized safety knowledge about high-temperature operations, explained construction safety precautions, and organized high-temperature emergency rescue drills such as heatstroke to improve the emergency rescue capabilities of on-site personnel. The project department closely monitors the weather forecast, formulates reasonable work and rest schedules, and communicates with the operators. Based on the characteristics of the high temperature season and the changes in temperature, the working hours are adjusted reasonably, and operators are arranged to avoid the high temperature period to prevent excessive fatigue and heatstroke of operators under high temperatures, and to prevent accidents before they occur. In order to do a good job in heatstroke prevention and cooling, we have equipped heatstroke prevention and cooling supplies and necessary standing medicines. The project department has purchased heatstroke prevention and cooling beverages, which are supplied to the staff every day to ensure their physical health; At the same time, the project department purchased some medical equipment and essential summer medicines, including blood pressure monitors, cold medicine, fever medicine, diarrhea medicine, anti-inflammatory drugs and other therapeutic drugs, as well as Ren Dan, Shi Di Shui, Zhengqi Shui, chrysanthemum tea, and fire reducing herbal tea.
With the care and support of company leaders and functional departments, the project department persistently adheres to comprehensive quality control. The project has received unanimous praise from local residents and recognition from the owners during its progress. In the future, the project department will continue to promote the corporate spirit of "civilized and high-quality, efficient and pragmatic, united and hardworking, and pioneering and innovative", and strive to create high-quality projects with a diligent and promising work state. |