homepage  |  Favorites  |  Chinese  |   weixin
Current position -> News -> Access to information

Access to information

The group company conducts practical training on high formwork and top pipe stress calculation
The publisher:czszjs    Release time:2024-10-12    Hit:148

 In order to further improve the correctness and scientificity of the engineering and technical personnel of the group company in preparing high-risk sub item project plans, and continuously optimize the practical ability and level of force calculation for high formwork and pipe jacking engineering, on the morning of July 31st, the group company successfully held a training activity on the practical operation of force calculation for high formwork support and pipe jacking engineering using the tea tasting software in the conference room on the 4th floor of Building 3. This training was organized by the General Engineering Office, with a total of 32 technical leaders and related technical personnel from each branch company participating.

This practical training specially invited Manager Liu Haiyang from the Technical Department of Pinming Software Technology Co., Ltd. to give an analysis and explanation. He mainly talked about two aspects: firstly, Manager Liu elaborated in detail on the nine major chapters involved in the high-risk sub projects and the key contents that need to be paid attention to in each chapter; In the second aspect, he demonstrated how to use the tea tasting software to calculate the stress of high formwork by using practical engineering construction cases, mainly including the stress calculation of formwork, small beams, main beams, top supports, upright poles, foundation, support stability, etc. He also demonstrated the stress calculation of the top pipe jack, relay room, rear backrest, pipeline axial force, grouting pressure, sinking well, etc. using the tea tasting software. Manager Liu's practical explanation was highly targeted, detailed, specific, and objective. It not only deepened everyone's knowledge in formulating plans, but also broadened their professional horizons in this area. It also strengthened the understanding of participants in the practical calculation process of high formwork and pipe jacking engineering, and achieved good training results. Everyone expressed that they had benefited greatly from this practical training.
This training activity not only includes theoretical knowledge of high formwork and pipe jacking force calculation, but also corresponding practical operation of force calculation. By combining professional theoretical knowledge with technical practical operation, it not only improves the professional theoretical level of technical leaders and related technical personnel in high formwork and pipe jacking engineering, but also further enhances everyone's practical skills, which can be said to be killing two birds with one stone.
Through this training, participants have gained a deeper understanding of how to reasonably prepare and scientifically calculate specialized plans for high-risk sub projects such as high formwork and pipe jacking engineering. This will further significantly improve the safety, economy, and operability of specialized construction plans for high-risk projects, and lay a solid foundation for the safety, stability, and high-quality development of the group company.
 
 
 

Print this page || Close the window

Jiangsu province Changzhou City Blue Ocean 158 North Road| Zip code:213017 | Telephone:0086-0519-85501558 | Fax:0086-0519-85501558 | E-mail:czsz@czszjt.com

Copyright © CHANGZHOU MUNICIPAL ADMINISTRATION CONSTRUCTION ENGINEERING CO.,LTD.  蘇ICP備12078434號(hào)-1   Technical support:Public science and technology