The construction company of twelve Bridge pavilion, located in Ma'anshan City in Binjiang new area, across the quarry River, estuary width is about 180m. The bridge connecting the planning of the style and features of ancient town area and the Binjiang new area, the landscape bridge in the region has become beautiful scenery with a spot.
The tenders for construction plans within the scope of the bridge engineering, road, water works.
Cross sectional design: 8m noncollinear board +3m roadside strip +11.5m motor drive +15m central green strip +11.5m motorway roadside strip +3m +11m =60m ( red line width of the board ).
Bridge Engineering: bridge load standard " automotive road grade Ⅰ, 3.5kN/㎡crowd; the bridge width: bridge four, full width 61m, horizontal layout : 61m=2×[ 0.5m (rail ) +3.5m ( sidewalk ) +4.5m ( non motorized vehicle lane ) +0.5m (rail ) +2m ( laterally spaced ) +0.5m ( +11.5m guardrail ) ( a ) ( +7m ( +0.5m guardrail ) laterally spaced upper bridge ) ]; 3*10+ (35+45+35) m+3*10m arch bridge, arch with transverse walls, wall erects the bridge deck, 45 meters hole using two parabola, box section; the lower bridge main pier with rectangular pile cap, pile using s 1400 bored pile, dowel plate as the foundation.
Gallery Pavilion: this project for the Chui Lo Hill style with the ancient city of area of the north, Binjiang new area of the south, erected and twelve pavilion bridge above the supporting engineering. The south, on the north side of the corridor for a length of 302 meters, a 8 seat, sightseeing tower 4 building. The main building structure of cast-in-place reinforced concrete roof truss for the traditional wood, antique building; wide, depth, roof, wood, decoration, tile practice size ratio are su style of traditional approaches for quasi |