Suzhou Industrial Park World campus circle loop project started
Suzhou Industrial Park, mulberry Island world of campus middle ring road project bid of a project scope: Road section: total length of about 2450.22 meters, 18 meters wide, including road subgrade ballast replacement ( the bottom width 18 meters, the top 28 meters wide ) processing, 40CM6% lime-soil ( top 28 meters wide ) processing, 40CM6% lime-soil ( top width 18 meters) processing, 20CM clay bound macadam pavement treatment, 6MM slurry seal. The bridge portion: built three bridges, respectively, north central longitudinal five bridge, West Bridge, south central longitudinal five rowing bridge, span is 5.5+8+5.5 meters, for reinforced concrete box culvert structure, using PHC600AB130 prestressed high strength concrete pile foundation. This construction does not implement the railings and fine asphalt deck pavement. Landscape pile foundation treatment: a total of 5, a total area of about 21934M2, including the foundation of ballast embankment filling, filling in earthwork.
After entering the site, we encounter difficulties, overcome all one one project department. Temporary homes because of all the reasons, only recently completed. Temporary homes after completion of project department management personnel living site, strictly abide by the system of work and rest and safe and civilized construction system. Due to the tight earthwork engineering, now the site has 10 excavators, 160 bulldozer, fork-lift truck 2, two rollers, hammer piling machine 1. On the road we day night excavation roadbed replacement ballast, the very next day leveling compaction, ensuring construction quality and smoothness. Party supervision on construction of our strength high praise. Has been completed 100 meters road test segments with ballast subgrade excavation backfill. North longitudinal Wuhe bridge pile foundation construction has been completed 50%, steel processing has also begun. Southern longitudinal Wuhe bridge pile foundation platform has excavation completed, due to cross road construction is also unable to approach for construction of pile foundation, our project department positive cooperativity party and supervision to unit associated with the communication, so that timely construction approach.
Although the time is tight and heavy tasks, attach great importance to the construction site safety. Many large earthmoving machinery, machinery must have certificate of approval, the driver must have a license, and strictly comply with the operating rules, not fatigue driving, working radius is not allowed. Managers, staff construction site must wear safety helmet, special operations personnel must hold card mount guard, project department is equipped with special security staff and engineering and technical personnel in charge of safety and full-time electrician responsible for the safe use of electricity, security guard and patrol. Foundation pit excavation in strict accordance with the norms of sloping, well before the construction of security technology, earth excavation management staff to command operation.
By one month's efforts, has made great progress in engineering.
Wu flood light |